IoTA_Logo(2).png

Institute of Transport Administration

Educating Transport Management since 1944

News

Road use of hydrogen-powered non-road mobile machinery – Consultation (closes 24 April 2024)

27th Mar 2024

Plan to transform the North's transport set to be approved

27th Mar 2024

Check which International Road Haulage permit you need

25th Mar 2024

Rail Partners response to open access

20th Mar 2024

IMO sub-committee on ship systems and equipment (SSE 10) Fire Safety

18th Mar 2024

View all news »

New rail tech roll-out set to bring more reliable journeys and boost jobs

28 Nov 2020

  • government invests £1.2 million to accelerate development work to roll-out digital signalling on 3 key rail routes
  • digital signalling programme will support supply chain by creating high-skilled jobs, boosting the economy
  • follows £350 million investment into ambitious digital signalling programme on East Coast Main Line

The roll-out of digital signalling – set to improve safety and slash delays – has been accelerated through £1.2 million of new government funding announced by Rail Minister Chris Heaton-Harris today (18 November 2020).

 

Feasibility work for digital signalling will be accelerated on vital sections of the West Coast Main Line, Midland Main Line and East Anglia route, including Peterborough to Kings Lynn on the Anglia route, and in the Warrington and Wigan area on the West Coast Mainline North.

 

This work will identify the most effective way to apply this type of technology to the railway and new way of working, capitalising on early engagement with the supply chain, and creating further opportunities to encourage innovation and drive efficiencies across regions.

 

Learning from the recent experience of the East Coast Digital Programme, where a partnership with route-based operators has been a success, this early scoping work will lay the foundation for future digital signalling renewals, as part of a wider national plan to introduce digital signalling across the rail network in Great Britain.

 

Rail Minister Chris Heaton-Harris said:

  • ‘We’ve come a long way since the era of metal levers, used by Victorian signallers to provide safe passage for trains rolling into and out of stations. Now it’s our turn to be modern transport pioneers as we build the railway of tomorrow.
  • Today’s investment brings forward early investigation work with Network Rail engineers and suppliers on how best to roll out digital signalling across the rail network, reducing delays and improving safety in the long term.
  • Our ambitious programme to modernise Britain’s rail network will support the supply chain by creating high-skilled jobs and boosting the economy, as we level up the country and build back better after COVID-19.’

Conventional signalling means the network can struggle to recover quickly following disruption with a small delay on one part of the railway still causing knock-on delays hundreds of miles away on other parts of the network, many hours later.

 

This new technology gives signallers much better real-time information about train movements, enabling them to communicate with train drivers continuously to reduce the impact of delays. This ‘in-cab’ system will mean an end to conventional signalling at the side of tracks – first used in the Victorian era.

 

As part of this work, the department is engaging with suppliers of digital signalling and industry experts across the country to learn from similar schemes and drive efficiency in the government’s nationwide programme to roll-out this technology on the railway, part of the commitment with industry in the rail sector deal.

 

Today’s news follows the announcement of £350 million of new investment toward the East Coast Digital Programme , which will introduce digital signalling on the East Coast Main Line, between London King’s Cross and Stoke Tunnel in Lincolnshire, ensuring that more passengers reach their destinations on time.

 

Further information:

https://www.gov.uk/government/news/new-rail-tech-roll-out-set-to-bring-more-reliable-journeys-and-boost-jobs?utm_source=dc4e0360-a744-44d9-977c-ee5241ee890b&utm_medium=email&utm_campaign=govuk-notifications&utm_content=daily