IoTA_Logo(2).png

Institute of Transport Administration

Educating Transport Management since 1944

News

Vauxhall Bridge 'could have to shut to buses'

23rd Nov 2026

National Highways speed enforcement camera issue

20th Nov 2026

Shared cycle scheme licensing - CONSULTATION

18th Nov 2026

Shared cycle scheme licensing - CONSULTATION

18th Nov 2026

Shared cycle scheme licensing - CONSULTATION

18th Nov 2026

View all news »

Vauxhall Bridge 'could have to shut to buses'

23 Nov 2026

Vauxhall Bridge will have to shut to buses and fire engines within two to four years unless about £60m is invested in repairs, Transport for London (TfL) has warned.

The crossing, which is the busiest bridge in central London, could even have to close fully to vehicles in four to 10 years without the necessary work, it said.

Some 44,000 vehicles use Vauxhall Bridge every day, including about 2,450 buses and 1,850 heavy goods vehicles.  While the bridge's waterproofing was renewed in 2020, there has been "significant deterioration of the underside steelwork" and "key structural elements [are] now in very poor condition".

The grade II listed bridge built in 1906 had an 18-tonne weight limit introduced in July to slow its deterioration, but a 7.5-tonne limit may have to be introduced by 2030, meaning the bridge would be shut to buses, coaches and many emergency service vehicles.

Further information:

https://www.bbc.co.uk/news/articles/c64gnzlq5w20o